Friday 13 February 2009


After some discussion Kev decided to paint the window wall in the production area. As we still had some of the stone coloured paint left from the offices he decided to use that. He got about half way along and felt a drip on his head. Although he pretended that it hadn't happened, it did happen again and Kev was forced to look to see what it was. It was the same joint as yesterday so this time it had to be stripped down and redone.



Once the painting was completed it was possible to turn our attentions to the floor. Kev tidied up the tools. We moved the other bits out to the retail area to have a completely clear space. The floor was then brushed and mopped. Well, most of it was mopped. I had bought a nice, shiny, new string mop and bucket. I started off in the far corner and decided that really I could do with an extension on the handle as this one was obviously built for someone the size of Joshua. I made a fair start and then Kev continued to mop. It was nearly done when he killed my mop - it is beyond repair - the head fell off!!!



It was good to see how well the floor came up and we are really looking forward to getting the grey floor paint on tomorrow. This will have a massive impact on how the space looks. As we are away next week it will give the area a good chance to dry out before we start to set it up properly.



I have to say a huge thank you to Murray who did a sterling job today. He brought our new office pc and spent the day sorting out and setting up with the various paraphanalia that we need for the business. I took this photo at the end of the day when the job was done, and he was upset because he had been so busy.



The children are on spring break today so we had the delightful presence of both Rebecka and George. Rebecka was a brilliant help during the day. I think George was having a meaningful conversation here!